Blandford Select Board Authorizes $39,000 Bridge Engineering, Extends Highway Superintendent Contract

BLANDFORD — June 29, 2026 — Blandford Select Board authorizes $39,000 in bridge engineering and approves highway superintendent renewal at joint department-head session. Meeting June 29, the board unanimously approved a Gill Engineering contract amendment to revise and resubmit state permitting documents for the Beach Hill Road bridge, funded through Chapter 90 highway funds, as part of a $6.6 million state pool shared among Blandford and two partner towns; members acknowledged a full construction loan — estimated at $1.5 million to $4 million — would require a separate town meeting vote. The board also signed a contract renewal for Highway Superintendent Ray through March 2027, adding up to $75 in commercial driver's license reimbursement every two years and a 5 percent pay increase. Water department staff reported between 25 and 30 accounts unpaid for a full year, totaling $30,000 or more in outstanding residential receivables, with liens on real estate tax bills identified as the primary collection path. Fire Chief Adam, attending by phone from Idaho, flagged a roughly $10,000 transmission repair needed on Engine 1 and early-stage talks with Springfield Water over expanded equipment funding for the department.

Keep reading with a 14-day free trial

Subscribe to Hampden County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Hampden County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe